Cannon House Service Rebuild

 

Aug 24, 2009

Zorko Electric worked with D Square Energy and Seattle City Light to coordinate an entire facility shutdown of a nursing home in Seattle, Washington.  A need to increase service capacity required a new service to be built alongside the existing live service.  The generator supplying required emergencyloads was also fed into the new ATS switches feeding the required safety systems in the building.  Power switchover was done in one day.